Park Facts:

  • Located along U.S. Highway 411 in the City of Etowah
  • Total park acreage = 600 acres
  • 272 +/- acres available for development
  • Largest contiguous tract 208 +/- developable acres
  • Zoned for heavy manufacturing
  • Interstates and Highways:
    • U.S. Highway 411 (4-laned) < 0.5 miles
    • State Highway 30 (4-laned) - 2 miles
    • Interstate 75 (north/south) - 12 miles
    • Interstate 40 (east/west) - 58 miles
    • Interstate 24 (east/west) – 70 miles
    • U.S. Highway 11 (4-laned) - 10 miles
  • Rail
    • Site served by CSX
    • CSX operates a rail yard in the City of Etowah offering 5 day service to the park
  • Airports:
    • McMinn County General Aviation – 10 miles
    • Knoxville McGhee Tyson Commercial Airport – 46.2 miles
    • Chattanooga Lovell Field Commercial Airport – 60.1 miles
    • Atlanta Hartsfield International Airport – 142.3 miles
    • Nashville International Airport – 199.1 miles
  • Riverports and Seaports
    • Port of Tellico (intermodal barge/rail) - 25 miles
    • Port of Savannah - 419 miles
    • Port of Charleston- 441 miles
  • Environmental Phase I Available
  • Geotechnical Report Available
  • Fiber optics available
  • Utilities (see map below):
    • All utilities served by Etowah Utilities Board
    • Electric served by Waupaca Substation with a total capacity of 80 MW and excess capacity of 24 MW.  Dual feed is feasible.
    • 8-inch natural gas line with 100 psi
    • 8-inch, 12-inch, and 16-inch water lines serve the park with 60 psi pressure
    • 8-inch gravity and 4-inch force main both serve the park

Park Tenants:

  • Consolidated Metco (Con/Met)
  • Johns Manville
  • Waupaca